Published in ENR: Drilling Down to Defend Against Drought in Atlanta

April 29, 2019

Both a design and engineering feat, the Bellwood Quarry-turned-reservoir will serve as Atlanta's emergency water source in case of another drought

 

Turning a century’s old quarry into one of America’s largest raw water reservoirs is no easy feat – but a truly necessary one when you look at the possibility of another devasting drought, climate variability, and a rapidly growing population. This new article from ENR shares the story of how the City of Atlanta, Stantec, and many other partners turned the Bellwood Quarry into 2.4-billion-gallon reservoir, increasing the city's drinking water supply from three days to thirty days and up to 90 days with water conservation measures. 
  
Read the full article published by ENR

Previous Article
Published in Infrastructure Intelligence: The Project 13 initiative - engineering behavioural change
Published in Infrastructure Intelligence: The Project 13 initiative - engineering behavioural change

Successful infrastructure investment requires the understanding and influence of behaviour as much as the d...

Next Flipbook
Tunneling Rules of Thumb: Shaft Construction and Support Methods
Tunneling Rules of Thumb: Shaft Construction and Support Methods

In this Tunnels and Tunneling magazine article, Keivan Rafie discusses the two most important aspects of sh...