Published: Minimal Disturbance: Milestone Project Tests Capabilities of Microtunnelling

June 26, 2019

How to design for the largest diameter microtunnelling project in North America as featured in Trenchless Technology Canada

 

Important insights from Metro Vancouver’s Milestone Microtunnelling Project – the South Surrey Interceptor. In order to accommodate growth and enhance environmental protection, often water utilities need to get creative to find capacity solutions. In this instance, twinning a second sewer line and getting there using a microtunnel boring machine was the answer. The path to a successful microtunnel installation starts well before the first pipe is ever pushed into the ground. In this article, Trenchless Technology magazine showcases the South Surrey Interceptor Johnson Road Phase 2 project and its path towards successfully navigating past, and through, many obstacles in what might be the largest diameter microtunnelling project in North America. 

Read full article in Trenchless Technology.

Previous Flipbook
Published in IWP&DC Magazine: Women in WaterPower
Published in IWP&DC Magazine: Women in WaterPower

Sandra Shuster recently discussed her insights into navigating the waterpower industry as a woman with IWP&...

Next Article
How to navigate aging infrastructure and utility conflicts in urban areas
How to navigate aging infrastructure and utility conflicts in urban areas

Aging infrastructure is an issue for cities across the US, including the City of Toledo, Ohio. For every ch...