Project layout challenges and optimizations for the Red Rock hydroelectric project

June 22, 2018 Gerri Fraser

Local Charlotte resident, Rachael Bisnett is a geotechnical engineer with 10 years of domestic and international experience and has focused on the analysis, design, and construction of hydroelectric projects.

Rachael is presenting on Project Layout Challenges and Optimizations for the Red Rock Hydroelectric Project on Wednesday, June 27 at 10AM.  

 

Previous Article
The perfect battery: Pumped storage hydropower is reliable, rechargeable, and clean
The perfect battery: Pumped storage hydropower is reliable, rechargeable, and clean

In the search for better renewable energy options, pumped storage hydropower projects may be the solution, ...

Next Article
Horse Mesa Dam Repair presentation by Fangbiao Lin
Horse Mesa Dam Repair presentation by Fangbiao Lin

Fangbiao Lin's background in hydraulic modeling, fluid dynamics, and turbulence modeling complements his ex...