Mental Health and Substance Use Wellness Centre at Royal Columbian Hospital - Video

November 21, 2018

View from the real time environment created by Stantec's Hayden Bennet and Aubrey Tucker, using TwinMotion technology

 

The project includes a new 75-bed mental health substance use (MHSU) building, an energy centre, including fit-out of equipment required to service the MHSU building and existing campus, four levels of underground parking, providing 400+ parking stalls for the campus, associated tunnel and bridge connections to the existing campus, civil construction of a campus IT network perimeter pathway system connecting the communications hub to the buildings and third-party structures, and which will be used for the installation of the fiber optic ring, conversion of most of the campus from steam to hot water, upgrades to campus-wide systems including humidification and electrical power, and fit-out of the campus communications hub. 

Previous Article
STEM is for everyone: 3 ways to “change the equation” of equality in the workplace
STEM is for everyone: 3 ways to “change the equation” of equality in the workplace

This year’s S.H.E. Summit offered a wide perspective on how we can cooperate across genders to build reward...

Next Article
From the Design Quarterly: What happens when hospitals move out?
From the Design Quarterly: What happens when hospitals move out?

What can our experience designing urban places tell us about planning for the next chapter of healthcare bu...