Mental Health and Substance Use Wellness Centre at Royal Columbian Hospital - Video

November 21, 2018

View from the real time environment created by Stantec's Hayden Bennet and Aubrey Tucker, using TwinMotion technology

 

The project includes a new 75-bed mental health substance use (MHSU) building, an energy centre, including fit-out of equipment required to service the MHSU building and existing campus, four levels of underground parking, providing 400+ parking stalls for the campus, associated tunnel and bridge connections to the existing campus, civil construction of a campus IT network perimeter pathway system connecting the communications hub to the buildings and third-party structures, and which will be used for the installation of the fiber optic ring, conversion of most of the campus from steam to hot water, upgrades to campus-wide systems including humidification and electrical power, and fit-out of the campus communications hub. 

Previous Article
A conference by the people, for the people: 4 takeaways from BILT North America
A conference by the people, for the people: 4 takeaways from BILT North America

The 2018 Buildings Infrastructure Lifecycle, supported by Technology (BILT) summit reinforces importance of...

Next Article
Merging design technologies helps fast-track transit project in fast-growing Seattle area
Merging design technologies helps fast-track transit project in fast-growing Seattle area

Unique, nontraditional, and highly coordinated BIM process helps Sound Transit’s new Operations and Mainten...