Mental Health and Substance Use Wellness Centre at Royal Columbian Hospital - Video

November 21, 2018

View from the real time environment created by Stantec's Hayden Bennet and Aubrey Tucker, using TwinMotion technology

 

The project includes a new 75-bed mental health substance use (MHSU) building, an energy centre, including fit-out of equipment required to service the MHSU building and existing campus, four levels of underground parking, providing 400+ parking stalls for the campus, associated tunnel and bridge connections to the existing campus, civil construction of a campus IT network perimeter pathway system connecting the communications hub to the buildings and third-party structures, and which will be used for the installation of the fiber optic ring, conversion of most of the campus from steam to hot water, upgrades to campus-wide systems including humidification and electrical power, and fit-out of the campus communications hub. 

Previous Article
Prefab lab systems: Concepts to optimize construction, maintenance, and flexibility
Prefab lab systems: Concepts to optimize construction, maintenance, and flexibility

Prefabricating multiple elements in the new Yale University Science Building eases construction and helps f...

Next Article
HoloLens on? Check. Ready for blast off. Destination: great design.
HoloLens on? Check. Ready for blast off. Destination: great design.

How an augmented reality spacewalk on the rocky surface of Mars marked the start of an opportunity that hel...