Mental Health and Substance Use Wellness Centre at Royal Columbian Hospital - Video

November 21, 2018

View from the real time environment created by Stantec's Hayden Bennet and Aubrey Tucker, using TwinMotion technology

 

The project includes a new 75-bed mental health substance use (MHSU) building, an energy centre, including fit-out of equipment required to service the MHSU building and existing campus, four levels of underground parking, providing 400+ parking stalls for the campus, associated tunnel and bridge connections to the existing campus, civil construction of a campus IT network perimeter pathway system connecting the communications hub to the buildings and third-party structures, and which will be used for the installation of the fiber optic ring, conversion of most of the campus from steam to hot water, upgrades to campus-wide systems including humidification and electrical power, and fit-out of the campus communications hub. 

Previous Article
Prefab lab systems: Concepts to optimize construction, maintenance, and flexibility
Prefab lab systems: Concepts to optimize construction, maintenance, and flexibility

Prefabricating multiple elements in the new Yale University Science Building eases construction and helps f...

Next Article
How the right-sizing of hybrid operating rooms helps hospitals, surgeons, and patients
How the right-sizing of hybrid operating rooms helps hospitals, surgeons, and patients

Advancing technology is moving OR imaging equipment from fixed and cumbersome to smaller and mobile